Pengumuman CIDBInfo Terkini

ULASAN UMUM BAGI DRAF STANDARD INDUSTRI PEMBINAAN (CIS): READY-MIXED CONCRETE: PRODUCTION, CONFORMITY, TRANSPORTATION AND DELIVERY CRITERIA FOR PRODUCERS

By Ogos 10, 2026No Comments

YBhg. Datuk/Dato’/Tuan/Puan,

PEMAKLUMAN MENGENAI ULASAN UMUM BAGI DRAF STANDARD INDUSTRI

PEMBINAAN (CIS):

READY-MIXED CONCRETE: PRODUCTION, CONFORMITY, TRANSPORTATION AND DELIVERY CRITERIA FOR PRODUCERS

Tujuan: Untuk mendapatkan ulasan / komen dari badan-badan kerajaan, ahli akademik dan industri bagi

draf standard yang telah dikemaskini. Jika tiada kaitan sila abaikan.

Tempoh ulasan: 06/08/2026 – 07/09/2026 (Tamat dalam 30 hari)

NO. TAJUK DRAF STANDARD JAWATANKUASA TEKNIKAL/KERJA TEMPOH ULASAN UMUM PAUTAN BORANG DAN DRAF CIS
1.  

READY-MIXED CONCRETE : PRODUCTION, CONFORMITY, TRANSPORTATION AND DELIVERY CRITERIA FOR PRODUCERS

 

JAWATANKUASA TEKNIKAL READY- MIXED CONCRETE : PRODUCTION, CONFORMITY, TRANSPORTATION AND DELIVERY CRITERIA FOR PRODUCERS

06/08/2026 – 07/09/2026

BORANG ULASAN

Sila klik link disertakan dalam jadual di atas untuk mendapatkan draf CIS dan borang ulasan. Sila hantar borang ulasan ke email seperti berikut:

[email protected] 

Sebarang pertanyaan boleh berhubung dengan pegawai berikut:

1. Fariz Izzuddin A.Azmi
No Telefon : 03-6206 7410
Email : [email protected]

announcement

 

 

This will close in 20 seconds