AnnouncementLatest Info
PRE-QUALIFICATION OF CONTRACTOR FOR THE EXECUTION AND COMPLETION OF FOUNDATION AND ASSOCIATED WORKS FOR THE PROPOSED DEVELOPMENT OF COMMERCIAL TOWER ON PLOT C7.12 AT TUN RAZAK EXCHANGE
Font Resizer
Previous PostKAJI SELIDIK BAGI KAJIAN PASARAN DI KALANGAN KONTRAKTOR BERDAFTAR, PEMILIK DAN PELAKSANA PROJEK MENGENAI PERSEPSI KEPERLUAN PENTAULIAHAN KONTRAKTOR PAKAR
Next PostPEMAKLUMAN PEKELILING CIDB BIL. 5/2024: PENYELARASAN SYARAT PENDAFTARAN BAGI KOD PENGKHUSUSAN CIDB BERKAITAN PERMIT A DAN C (SPAN)
Recommended For You
AnnouncementLatest Info
ULASAN UMUM BAGI DRAF STANDARD INDUSTRI PEMBINAAN (CIS): READY-MIXED CONCRETE: PRODUCTION, CONFORMITY, TRANSPORTATION AND DELIVERY CRITERIA FOR PRODUCERS
ULASAN UMUM BAGI DRAF STANDARD INDUSTRI PEMBINAAN (CIS): READY-MIXED CONCRETE: PRODUCTION, CONFORMITY, TRANSPORTATION AND DELIVERY CRITERIA FOR PRODUCERS
YBhg. Datuk/Dato’/Tuan/Puan, PEMAKLUMAN MENGENAI ULASAN UMUM BAGI DRAF STANDARD INDUSTRI PEMBINAAN (CIS): READY-MIXED CONCRETE: PRODUCTION,…
AzniraAugust 10, 2026
AnnouncementLatest Info
ULASAN UMUM BAGI DRAF STANDARD INDUSTRI PEMBINAAN (CIS): MANUAL FOR IBS CONTENT SCORING SYSTEM (IBS SCORE)
ULASAN UMUM BAGI DRAF STANDARD INDUSTRI PEMBINAAN (CIS): MANUAL FOR IBS CONTENT SCORING SYSTEM (IBS SCORE)
YBhg. Datuk/Dato’/Tuan/Puan, PEMAKLUMAN MENGENAI ULASAN UMUM BAGI DRAF STANDARD INDUSTRI PEMBINAAN (CIS): MANUAL FOR IBS…
AzniraAugust 10, 2026
AnnouncementLatest Info
APPOINTMENT OF THE CONTRACTOR TO PERFORM THE CLEANING SERVICES FOR MRT PYL, KGL AND MRL
APPOINTMENT OF THE CONTRACTOR TO PERFORM THE CLEANING SERVICES FOR MRT PYL, KGL AND MRL
AzniraJuly 30, 2026


