AnnouncementLatest Info
PRE-QUALIFICATION OF CONTRACTOR FOR THE EXECUTION AND COMPLETION OF FOUNDATION AND ASSOCIATED WORKS FOR THE PROPOSED DEVELOPMENT OF COMMERCIAL TOWER ON PLOT C7.12 AT TUN RAZAK EXCHANGE
Font Resizer
Previous PostKAJI SELIDIK BAGI KAJIAN PASARAN DI KALANGAN KONTRAKTOR BERDAFTAR, PEMILIK DAN PELAKSANA PROJEK MENGENAI PERSEPSI KEPERLUAN PENTAULIAHAN KONTRAKTOR PAKAR
Next PostPEMAKLUMAN PEKELILING CIDB BIL. 5/2024: PENYELARASAN SYARAT PENDAFTARAN BAGI KOD PENGKHUSUSAN CIDB BERKAITAN PERMIT A DAN C (SPAN)
Recommended For You
AnnouncementLatest Info
TENDER FOR DESIGN, FABRICATE, SUPPLY, INSTALL, TESTING AND COMMISSIONING OF THE NEW PEDESTRIAN OVERHEAD BRIDGE AND COVERED WALKWAY CONNECTING MSPR TAMAN MIDAH (MSPR6) AND CHERAS REHABILITATION HOSPITAL (HRC) (“WORKS”)
TENDER FOR DESIGN, FABRICATE, SUPPLY, INSTALL, TESTING AND COMMISSIONING OF THE NEW PEDESTRIAN OVERHEAD BRIDGE AND COVERED WALKWAY CONNECTING MSPR TAMAN MIDAH (MSPR6) AND CHERAS REHABILITATION HOSPITAL (HRC) (“WORKS”)
farishaNovember 25, 2026
AnnouncementLatest Info
WEBINAR ON MANDATORY MALAYSIAN STANDARD FOR READY MIXED CONCRETE (RMC) IN FOURTH SCHEDULE ACT 520 CIDB, VOL. 3.0
WEBINAR ON MANDATORY MALAYSIAN STANDARD FOR READY MIXED CONCRETE (RMC) IN FOURTH SCHEDULE ACT 520 CIDB, VOL. 3.0
Webinar ini bertujuan untuk memberikan pendedahan kepada penggiat industri pembinaan mengenai bahan binaan dan standard…
farishaNovember 25, 2026
AnnouncementLatest Info
TENDER (RTS LINK) ANTARA JOHOR BAHRU DAN SINGAPURA – DESIGN, INSTALLATION, INTEGRATION AND COMPLETION OF DURATION CONTROL MEASURE (DCM) FOR DROP- OFF PICK-UP AREAS (DOPU) OF RTS LINK
TENDER (RTS LINK) ANTARA JOHOR BAHRU DAN SINGAPURA – DESIGN, INSTALLATION, INTEGRATION AND COMPLETION OF DURATION CONTROL MEASURE (DCM) FOR DROP- OFF PICK-UP AREAS (DOPU) OF RTS LINK
AzniraNovember 20, 2026


