WHAT IS MyCESMM2?

MyCESMM2 is a single measurement standard, which can be used as a single basis in Bills of Quantites (BQ) preparation for civil engineering works, contracts costing as well as tender documents preparation and submission.

MyCESMM2 stipulates the definition, description, rules of measurement, and coverage, which can be found in even the smallest civil engineering project. Through the use of MyCESMM2, cost-effective projects are more achievables as the same standard measurement is used for all related works.

From the 2001 CESMM, the standard evolved into MyCESMM in 2013. Through rigorous adaptation of CESMM3 (UK), CESMM4 (UK) and current local practices, the standard is now known as MyCESMM2.

 

 

WHY USE MyCESMM2 IN BQ PREPARATION


>Efficient & systematic BQ preparation.

>Single standard methodology measurement enables cost transparency and minimizes disputes during contract negotiation.

>Standardised BQ across the local construction industry.

>Common understanding of work items.

>Competitive and consistent pricing.

>Easy benchmarking for future cost comparison.

>Facilitates contract management.

>Reduces ambiguities in project costs.

>Less confusion as estimations, valuations and cost control formulation are simplified.

>True nature of works is reflected hence reducing probability of future ambiguities and disputes during project implementation

 

MyCESMM2’s MILESTONES

>MyCESMM has now been assimilated as learning reference at more than 10 public and private higher learning instituitions.

>More industry professionals are now certified with MyCESMM, with close to 50 trainers nationwide and over 600 industry professionals already undergone training.

>Collaboration with over 20 public and private agencies to promote the use of MyCESMM.

>Over 30 public and private projects were reported to have used MyCESMM in their implementation.

 

IMPROVED AND UPDATED MyCESMM2 DOCUMENT


>CIDB has updated and improved the MyCESMM2 document in its efforts to drive the Malaysian construction industry to become a productive and internationalized entity as aspired by the Construction Industry Transformation Programme.

>The new MyCESMM2 contains 3 revised Work Classes – Class I, O and S and 3 new work classes: Class P (Pipe Rehabilitation Work), U (Mechanical & Electrical Works), and W (Provisional & Prime Cost Sum).

>MyCESMM2 is now in vertical layout for easy referencing and readability.

>Complementary document to MS 2701:2018 Civil Engineering – Standard Method of Measurement by Department of Standards Malaysia (www.msonline.gov.my).

MyCESMM2 Brochure FAOL 01

 

MyCESMM2 DOCUMENTS

MyCESMM2 available in set of 3 books:

1.Malaysian Civil Engineering Standard Method of Measurement: Second Edition

2.A Guide to Malaysia Civil Engineering.

3.Library of Standard BQ Descriptions for Malaysian Civil Engineering Standard Method of Measurement: Second Edition

 

1.Cover MyCESMM2 01   2.Cover Guide MyCESMM2 01   3.Cover Library MyCESMM2 01

      Green Book                      Brown Book                      Red Book

 

PURCHASING DETAIL

 

Price: RM145.00/set

 

To purchase:

Level 12, Bahagian Kewangan,

CIDB Malaysia,

Menara Dato Onn,

PWTC, No.45, Jalan Tun Ismail, 50480, Kuala Lumpur

 

Further inquiries:

Call: 03-4047 7364

Fax: 03-4047 7330

Email: Alamat emel ini dilindungi dari Spambot. Anda perlu hidupkan JavaScript untuk melihatnya.

KOD QR

iso 01iso 02

iso 03iso 04