cidb careline v1 01 
cidb careline clickv2 01

Prior to carrying out the assessment, construction elements to be assessed are determined through a sampling and statistical approach. These samples are distributed evenly throughout the project.

 

Assessment samples are selected from drawings and plans of the relevant construction project. All locations in the construction project shall be made available for the assessment. This is to ensure that the selected samples adequately represent the entire construction project.

KOD QR

iso 01iso 02

iso 03iso 04